{"id":1911,"date":"2025-08-04T23:27:36","date_gmt":"2025-08-04T23:27:36","guid":{"rendered":"https:\/\/aesusdesign.com\/wpaesus\/?p=1911"},"modified":"2026-02-19T20:42:48","modified_gmt":"2026-02-19T20:42:48","slug":"construction-begins-at-the-prrc-in-mather-ca","status":"publish","type":"post","link":"https:\/\/aesusdesign.com\/wpaesus\/index.php\/2025\/08\/04\/construction-begins-at-the-prrc-in-mather-ca\/","title":{"rendered":"Construction Begins at the PRRC\u00a0in Mather, CA"},"content":{"rendered":"\n<p>The design of this Psychosocial Rehabilitation and Recovery Center (PRRC) began during the Covid-19 Pandemic and endured some difficult value engineering. The two-story building includes mental health education\/treatment on the first floor and a Sleep Study center on the second floor. It will primarily function to support the transition back into the community for our nation&#8217;s Veterans. We are grateful to finally see that it&#8217;s coming to life with the help of <a href=\"https:\/\/www.linkedin.com\/company\/patriot-construction-inc.\/\">Patriot Construction, Inc.<\/a> as the general contractor. Thank you to our design consultants, including <a href=\"https:\/\/www.linkedin.com\/company\/kimley-horn\/\">Kimley-Horn<\/a> (structural), <a href=\"https:\/\/www.linkedin.com\/company\/zona-technical-engineering\/\">Zona Technical Engineering<\/a> (electrical), Calibre (Civil), and <a href=\"http:\/\/www.thedesignlabaz.com\/\" target=\"_blank\" rel=\"noreferrer noopener\">The Design Laboratory<\/a> (landscape). For more information, see <a href=\"https:\/\/www.linkedin.com\/posts\/aesus-design-group_our-team-is-excited-to-announce-some-visual-activity-7358256143065890816-vlb0?utm_source=share&amp;utm_medium=member_desktop&amp;rcm=ACoAAAH44vABZHVI6p0qW5gb9b7CIOiYPJULd2M\">Press Release here<\/a><\/p>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-1 is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"387\" data-id=\"1913\" src=\"https:\/\/aesusdesign.com\/wpaesus\/wp-content\/uploads\/2025\/08\/PRRC-Walkup-Sketch-1024x387.jpg\" alt=\"\" class=\"wp-image-1913\" srcset=\"https:\/\/aesusdesign.com\/wpaesus\/wp-content\/uploads\/2025\/08\/PRRC-Walkup-Sketch-1024x387.jpg 1024w, https:\/\/aesusdesign.com\/wpaesus\/wp-content\/uploads\/2025\/08\/PRRC-Walkup-Sketch-300x113.jpg 300w, https:\/\/aesusdesign.com\/wpaesus\/wp-content\/uploads\/2025\/08\/PRRC-Walkup-Sketch-768x290.jpg 768w, https:\/\/aesusdesign.com\/wpaesus\/wp-content\/uploads\/2025\/08\/PRRC-Walkup-Sketch-1536x580.jpg 1536w, https:\/\/aesusdesign.com\/wpaesus\/wp-content\/uploads\/2025\/08\/PRRC-Walkup-Sketch-2048x773.jpg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"560\" height=\"420\" data-id=\"1917\" src=\"https:\/\/aesusdesign.com\/wpaesus\/wp-content\/uploads\/2025\/08\/PRRC-Vapor-Barrier-edited.jpg\" alt=\"\" class=\"wp-image-1917\" srcset=\"https:\/\/aesusdesign.com\/wpaesus\/wp-content\/uploads\/2025\/08\/PRRC-Vapor-Barrier-edited.jpg 560w, https:\/\/aesusdesign.com\/wpaesus\/wp-content\/uploads\/2025\/08\/PRRC-Vapor-Barrier-edited-300x225.jpg 300w\" sizes=\"auto, (max-width: 560px) 100vw, 560px\" \/><\/figure>\n<\/figure>\n","protected":false},"excerpt":{"rendered":"<p>The design of this Psychosocial Rehabilitation and Recovery Center (PRRC) began during the Covid-19 Pandemic and endured some difficult value engineering. The two-story building includes mental health education\/treatment on the first floor and a Sleep Study center on the second floor. It will primarily function to support the transition back into the community for our &hellip;<\/p>\n<p class=\"read-more\"> <a class=\"\" href=\"https:\/\/aesusdesign.com\/wpaesus\/index.php\/2025\/08\/04\/construction-begins-at-the-prrc-in-mather-ca\/\"> <span class=\"screen-reader-text\">Construction Begins at the PRRC\u00a0in Mather, CA<\/span> Read More &raquo;<\/a><\/p>\n","protected":false},"author":2,"featured_media":1924,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_uag_custom_page_level_css":"","site-sidebar-layout":"left-sidebar","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"disabled","footer-sml-layout":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"set","footnotes":""},"categories":[6],"tags":[12,11,13],"class_list":["post-1911","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-construction-updates","tag-outpatient-clinic","tag-prrc","tag-va-mather"],"uagb_featured_image_src":{"full":["https:\/\/aesusdesign.com\/wpaesus\/wp-content\/uploads\/2025\/08\/PRRC-Concrete-Pour-1.jpg",692,494,false],"thumbnail":["https:\/\/aesusdesign.com\/wpaesus\/wp-content\/uploads\/2025\/08\/PRRC-Concrete-Pour-1-150x150.jpg",150,150,true],"medium":["https:\/\/aesusdesign.com\/wpaesus\/wp-content\/uploads\/2025\/08\/PRRC-Concrete-Pour-1-300x214.jpg",300,214,true],"medium_large":["https:\/\/aesusdesign.com\/wpaesus\/wp-content\/uploads\/2025\/08\/PRRC-Concrete-Pour-1.jpg",692,494,false],"large":["https:\/\/aesusdesign.com\/wpaesus\/wp-content\/uploads\/2025\/08\/PRRC-Concrete-Pour-1.jpg",692,494,false],"1536x1536":["https:\/\/aesusdesign.com\/wpaesus\/wp-content\/uploads\/2025\/08\/PRRC-Concrete-Pour-1.jpg",692,494,false],"2048x2048":["https:\/\/aesusdesign.com\/wpaesus\/wp-content\/uploads\/2025\/08\/PRRC-Concrete-Pour-1.jpg",692,494,false]},"uagb_author_info":{"display_name":"Lisa Marchi","author_link":"https:\/\/aesusdesign.com\/wpaesus\/index.php\/author\/lmarchi\/"},"uagb_comment_info":0,"uagb_excerpt":"The design of this Psychosocial Rehabilitation and Recovery Center (PRRC) began during the Covid-19 Pandemic and endured some difficult value engineering. The two-story building includes mental health education\/treatment on the first floor and a Sleep Study center on the second floor. It will primarily function to support the transition back into the community for our&hellip;","_links":{"self":[{"href":"https:\/\/aesusdesign.com\/wpaesus\/index.php\/wp-json\/wp\/v2\/posts\/1911","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/aesusdesign.com\/wpaesus\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/aesusdesign.com\/wpaesus\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/aesusdesign.com\/wpaesus\/index.php\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/aesusdesign.com\/wpaesus\/index.php\/wp-json\/wp\/v2\/comments?post=1911"}],"version-history":[{"count":5,"href":"https:\/\/aesusdesign.com\/wpaesus\/index.php\/wp-json\/wp\/v2\/posts\/1911\/revisions"}],"predecessor-version":[{"id":1923,"href":"https:\/\/aesusdesign.com\/wpaesus\/index.php\/wp-json\/wp\/v2\/posts\/1911\/revisions\/1923"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/aesusdesign.com\/wpaesus\/index.php\/wp-json\/wp\/v2\/media\/1924"}],"wp:attachment":[{"href":"https:\/\/aesusdesign.com\/wpaesus\/index.php\/wp-json\/wp\/v2\/media?parent=1911"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/aesusdesign.com\/wpaesus\/index.php\/wp-json\/wp\/v2\/categories?post=1911"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/aesusdesign.com\/wpaesus\/index.php\/wp-json\/wp\/v2\/tags?post=1911"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}